Skip to main content
For Plant Superintendents, Mining GMs & Logistics Directors

Model Bottlenecks.
Not Average Cycle Times.

  • Spreadsheets ignore physical breakdowns and compounding delays.
  • Stop making CapEx decisions on flat averages.
  • Simulate your exact shift schedules and machine queues.
  • Prove your operational plan survives reality.
Because hope is not a strategy.

Example Problem

Maintain or replace? MTTF and MTTR help, but only go so far in dynamic operations.

Baseline scenario: Imagine a concrete supply company.
You've got fixed assets with pumps, cranes, and mixers in the cement plant. Meanwhile, you've got a fleet of mobile equipment like concrete trucks, forklifts, and light vehicles.

Alternative scenario: Should you replace your aging concrete truck fleet?
New gear can run smoothly, but will the cost of capital for the new assets outweigh the operational cost of keeping the existing fleet and continuing with increased maintenance and breakdown consequences?

Uncertainties: How do you really know when a spreadsheet can't capture the random physical breakdowns? Trust only goes so far with the executive team.

CERTAINIUM Solutions

How to resolve uncertainty with the PHOR platform.

PHOR-SEE

Simulates the physical queues, bath-tub breakdown curves, and dispatch constraints to prove whether the new fleet CapEx delivers a higher NPV than the maintenance alternative.

PHOR-TELL

Guides your operational leadership to actually adhere to the optimal dispatch and maintenance schedules.

PHOR-WARN

Ranks your most sensitive tasks, like preventative maintenance on the primary mixer, and ensures the right people are accountable for keeping them on track.

Operational Fit & Capabilities

Recommended Tier: Professional or Enterprise

Constructed for asset leaders managing complex, physical throughput systems who need continuous simulation and proactive telemetry sentinels.

Single Site / Plant Focus Most Popular

Professional Tier

$999 / month ($799/mo billed annually)

Best for plant managers and logistics superintendents dedicated to one facility who need ongoing scenario modeling, constraint mapping, and shift dispatch optimization.

✓ Up to 5 User Seats for plant & logistics superintendents
✓ 50,000 Scenario Runs/mo via PHOR-SEE
✓ PHOR-TELL MCP assistant for shift constraints & dispatch
✓ Telemetry drift alerts with PHOR-WARN via FastMCP
✓ Direct CSV production log upload & automatic parameter fitting
Multi-Site Operations Enterprise Site License

Enterprise Tier

From $4999 / month (From $75k/yr ACV)

For regional or global mining, manufacturing, and supply chain operators running multiple sites, SCADA/historian feeds, and dedicated private VPC infrastructure.

✓ 20+ User Seats / Multi-site network
✓ Unlimited Scenario Runs & multi-site optimization with PHOR-TUNE
✓ Automated SCADA / OSIsoft PI data historian ingestion
✓ Dedicated site reliability engineers & model calibration
✓ Enterprise SOC2 Type II, ISO 27001, on-prem/hybrid VPC deployment

Stop Guessing Where the Floor Breaks

Arm your operations team with the empirical proof needed to command plant throughput and ground planning in physical reality.